Loading...
HomeMy WebLinkAboutBLACKBERRY MANOR DECISION PACKET 4 _08-16-07 DRB DECISION PACKET Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: BLACKBERRY MANOR PHASE 1 Development Type: Major Subdivision Preliminary Plan/Plat Date: May 30,2007 (meeting date) Revisions submitted July 25, 2007 The above referenced application is CONDITIONALLY APPROVED as listed below. SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting. E911/Addressing: Master Plan: BUNNLEVEL-ERWIN RD should be BUNNLEVEL ERWIN RD (no hyphen) RIGHT SIDE OF MAP ABOVE TOWNSHIP INFO: Bunnlevel-Erwin Rd should be Bunnlevel Erwin Rd (no hyphen) Fire Mashal: Fire hydrants are not located on this plan Fire Mashal: The temp turnaround on Silvan Park, but is Youngberry park Drive going to connect to Covington Rd.. ( I would like it if it did ) Planning Department: NONCONFORMING LOT ADJACENT TO ENTRANCE AND LOT 1 MUST BE NOTED AS NONBUILDABLE Planning Department: LOTS 13 AND 16 DO NOT MEET MINIMUM LOT WIDTH Planning Department: PROVIDE STUBOUTS TO ADJACENT PROPERTY ON MASTER PLAN (LOTS AT LOCATION OF STUBOUTS MUST BE REMOVED; STUBOUTS MUST BE SHOWN JUST AS OTHER RIGHT-OF-WAYS ARE SHOWN ON PLAN) Planning Department: Planning Department: Planning Department: Planning Department:  :  :  :  :    BLACKBERRY MANOR DECISION PACKET 4 (08-16-07) 3/16/2009 1  LONG RANGE CONDITIONS The following conditions must be satisfied Public Utilities: THE DEVELOPER MUST PROVIDE A ONE YEAR WARRANTY ON THE WATER SYSTEM ONCE APPROVED BY NCDENR AND HCDPU. WATER METERS WILL NOT BE RELEASED TO THIS PHASE UNTIL THE FINAL APPROVALS HAVE BEEN ISSUED BY NCDENR Public Utilities: EASEMENT INCLUDING LIFT STATION MUST BE DEEDED TO HCDPU PRIOR TO OR AT THE TIME OF FINAL RECORDATION Public Utilities: THE DEVELOPER'S PROFESSIONAL ENGINEER (PE) MUST OBTAIN THE NCDENR PERMITS FOR THE WATER AND SEWER UTILITY IMPROVEMENTS AND PROVIDE COPIES OF THE PERMITS TO THE UTILITY CONTRACTOR BEFORE CONSTRUCTION MAY BEGIN. THE UTILITY CONTRACTOR MUST POST THE NCDENR PERMITS ON SITE AND KEEP THEM ON SITE DURING THE CONSTRUCTION OF THE PROJECT. THE UTILITY CONTRACTOR MUST ALSO SCHEDULE A PRE- CONSTRUCTION CONFERENCE WITH HCDPU PRIOR TO THE START OF CONSTRUCTION  :  :  :  :  :  :     Development Review Board Chairman If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you the next business day. If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. If HELD, you must submit 10 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff to discuss other potential options. BLACKBERRY MANOR DECISION PACKET 4 (08-16-07) 3/16/2009 2