PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Ballard Woods - Phase 4
Property Description
PIN(s): 0651-39-0029.000 Acreage: 54.00 acres
Address/SR No.: Ballard Road (SR 1437) and Joseph Alexander Drive
Fire District: Summerville Zoning: RA-30
HTE No.: TownshipHectors Creek
:
Water
Public water is available for this development (via Harnett County)
Comments: HCDPU has an existing six (6") inch water line located on the north side of Joseph Alexander
Drive.
Sewer
Public sewer is not available for this development (via Harnett County)
Comments: HCDPU has a wastewater interceptor in the vicinity of this project site; however, it is not
ready for operation and therefore the developer would not be required to connect to the county sewer
system at this time. If the wastewater interceptor becomes operational before the project is approved
for
construction, then the subdivision would be required to extend wastewater collection lines from the
subdivision to the wastewater interceptor to serve this project.
If the developer decides to install septic tanks in lieu of connecting to the the county sewer system, the
a
Soil Scientist must provide report to Environmental Health Dept.
Ballot
REVIEWER: Tim Payseur Date: Jan. 10, 2007
VOTE: Conditionally Approve
CONDITIONS: The proposed utilities must be approved by HCDPU and NCDENR. All permits for this
project have been obtained from NCDENR. These permits must be posted on site prior to start of
construction.
NOTE: This approval is also subject to availability of wastewater capacity at the nearest wastewater
treatment plant and the associated sewer collection system. Although, the NCDENR water and sewer
permits have been issued to HCDPU, the wastewater interceptor located near this subdivision has not
been
placed into operation. For this reason, the devloper may elect to install septic tanks. If septic tanks are
installed for this phase, then the lot layout may need to be adjusted.
Page 1 of 1 PUBLIC UTILITIES STAFF REPORT