Loading...
HomeMy WebLinkAboutPU Revision Denial 08.04.09 Page 1 of 2 From: Timothy Payseur Sent: Wednesday, April 09, 2008 3:46 PM To: 'Oak City Homes' Cc: Samantha Ficzko Subject: RE: Just checking Grey,   I thought that everything was OK with Public Utilities and then something came up.  I had a concerned raised by our Locator, Billy Norris about the tracer wire on the water line.  He has tried to set up his locating equipment at several valve boxes where the tracer wire is accessible and for some reason he cannot get a signal to transmit through the tracer wire that helps to identify the exact location of the water main.    I have called Brent Honeycutt at Format and asked him to follow up on this issue to see if the wire was cut, spliced or damaged in some way.  The tracer wire should be installed from valve box to valve box with no splices or underground connections to provide a solid conductor over the water line.  This tracer wire is the only means that we have to locate the water line in the field.    When Billy came in the office to check the As-Built maps, we could not find the As-Built drawings.  Apparently we did not receive the final As-Built Record Drawings.  After reviewing all documents and drawings on file for Ballard Woods Phase 4, I have determined that we have not received the PE Certifications or the Cost Statements either.  If you will provide the cost statements for the water and sewer improvements and have Jay Gilleece to forward the As-Built drawings and PE Certifications to our office then we can release the map to be recorded.  I apologize for the last minute kink, but everything needs to be finished and I thought that we had those final documents on file, but they have not been submitted to our office.  We can work with Brent on the tracer wire repair/replacement if the As-Builts, PE Certifications and Cost Statements are turned in.  Call me if you have any questions.       Regards,  Tim ============================== Tim Payseur, Senior Engineering Technician Harnett County Department of Public Utilities 308 West Duncan Street P O Box 1119 Lillington, NC  27546-1119 Phone: (910) 893-7575, ext 3275 Fax: (910) 814-4024 E-mail: tpayseur@harnett.org www.harnett.org ==============================   Water Use It Wisely      file://C:\Documents and Settings\subdivision\Local Settings\Temp\ELF263\PU Revision D...3/16/2009 Page 2 of 2     -----Original Message----- From: Oak City Homes [mailto:greyoch@nc.rr.com] Sent: Wednesday, April 09, 2008 11:35 AM To: Samantha Ficzko; Joseph Jeffries; Mark Locklear; Timothy Payseur; Mickey Bennett Subject: Just checking   Just checking to see where we are on finalizing the map for Ballard Woods phase 4A.  It's my understanding from Mickey that the map was re-drawn and submitted to all the dept. within Harn. Co. last week for review (APPROVAL?).   Let me know.   Thanks Grey file://C:\Documents and Settings\subdivision\Local Settings\Temp\ELF263\PU Revision D...3/16/2009