Loading...
HomeMy WebLinkAboutPU-SR-02 The Developer must provide HCDPU a one (1) year warranty on the water lines installed to  serve this development. Provide HCDPU with Master development Plan if additional phases are planned for this  subdivision. The Developer must pay the required capacity fees for this developmentand the water lines  must be approved by HCDPU and NCDENR before meters can be released for the lots in this subdivision. Page 2 of 2PUBLIC UTILITIES STAFF REPORT PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Asheford Subdivision - Final Plan/Plat Property Description PIN(s): 9574-59-2534.000 Acreage: 111.73 acres Address/SR No.: Marks Road (SR 1111) Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): Marks Road (SR 1111) Nearest water line size: 6" Fire flow is available for this development Lines permitted under DENR Permit: 07-01166 (DEH Serial Number) Sewer Public sewer is not available for this development (via Harnett County) Sewer capacity is not available for this development Nearest sewer line location (Road name & SR#): Nearest sewer line size: Lines permitted under DENR Permit: (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: 04-09-2008 VOTE: Hold CONDITIONS: SHORT TERM: The final inspection on the water lines installed in this subdivision must be completed by  HCDPU. The P.E. must submit As-Built Record Drawings, P.E. Certification to HCDPU.  The Developer must provide HCDPU a Cost Statement for the water system improvements  installed to serve this subdivision. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.  Page 1 of 2PUBLIC UTILITIES STAFF REPORT