HomeMy WebLinkAboutPU-SR-01
Provide HCDPU with Master development Plan if additional phases are planned for this
subdivision.
The Developer must provide HCDPU a Cost Statement for the water system improvements
installed to serve this subdivision.
The Developer must pay the required capacity fees for this developmentand the water lines
must be approved by HCDPU and NCDENR before meters can be released for the lots in this
subdivision.
Page 2 of 2PUBLIC UTILITIES STAFF REPORT
PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Asheford Subdivision - Final Plan/Plat
Property Description
PIN(s): 9574-59-2534.000 Acreage: 111.73 acres
Address/SR No.: Marks Road (SR 1111)
Water
Public water is available for this development (via Harnett County)
Water capacity is available for this development
Nearest water line location (Road name & SR#): Marks Road (SR 1111)
Nearest water line size: 6"
Fire flow is available for this development
Lines permitted under DENR Permit: Not Permitted Yet (DEH Serial Number)
Sewer
Public sewer is not available for this development (via Harnett County)
Sewer capacity is not available for this development
Nearest sewer line location (Road name & SR#):
Nearest sewer line size:
Lines permitted under DENR Permit: (DWQ Serial Number)
Additional Requirements
As-Built Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s Certifications for water/sewer extension Yes No
N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Tim Payseur Date: 03-19-2008
VOTE: Hold
CONDITIONS:
SHORT TERM:
The final inspection on the water lines installed in this subdivision must be completed by
HCDPU.
The P.E. must submit As-Built Record Drawings, P.E. Certification to HCDPU.
LONG RANGE:
Please visit www.harnett.org/utilities for more information on the approval process.
The Developer must provide HCDPU a one (1) year warranty on the water lines installed to
serve this development.
Page 1 of 2PUBLIC UTILITIES STAFF REPORT