Loading...
HomeMy WebLinkAbout072-023-F-SR-Public Utilities PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: ANDERSON CREEK CLUB PH 4B-1A 072-023 Property Description PIN(s): Acreage: acres Address/SR No.: Water Public water is available for this development (via Harnett County) Comments: The new water lines installed in Phase 4B-1A have been inspected and tested per Harnett County Department of Public Utilities (HCDPU) requirements. The professional engineer has not submitted the As-Built Record Drawings, PE Certification and Cost Statement to HCDPU. The Developer and Contractor must provide HCDPU with a one (1) year warranty on the new water lines that serve this phase of the subdivision once approved by HCDPU. Sewer Public sewer is available for this development (via Harnett County) Comments: The new sewer collection lines installed in Phase 4B-1A have been inspected and tested per Harnett County Department of Public Utilities (HCDPU) requirements. The professional engineer has not submitted the As-Built Record Drawings, PE Certification and Cost Statement to HCDPU. The Developer and Contractor must provide HCDPU with a one (1) year warranty on the new sewer lines that serve this phase of the subdivision once approved by HCDPU. NOTE: HCDPU provides this information as a curteousy to the developer and professional engineer for design purposes. However, HCDPU cannot be held liable for errors, mistakes, ommissions, and inaccurate information provided through this preliminary and/or final plat approval process. It is therefore recommended that the professional engineer or developer "field verify" the information provided by HCDPU. Ballot REVIEWER: Tim Payseur Date: Feb. 28, 2007 VOTE: Hold CONDITIONS: SHORT TERM: The professional engineer must submit the As-Built Record Drawings, PE Certification and Cost Statement to HCDPU for the new water and sewer collection lines installed in this phase of the subdivision. LONGE RANGE: The Developer and Contractor must provide HCDPU with a one (1) year warranty on the new water and sewer collection lines and associated appurtenances that serve this subdivision once approved by HCDPU. Page 1 of 1 PUBLIC UTILITIES STAFF REPORT