Loading...
HomeMy WebLinkAbout007-0-31-F SR Public Utilities 01 PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Anderson Creek Club - Townhomes Phase 1 Property Description PIN(s): 0505-89-2493.000 Acreage: 0.45 acres Address/SR No.: Hawk Ridge Drive Water Public water is available for this development (via Harnett County) Comments: The new water lines installed on Hawk Ridge Drive were approved by Harnett County Department of Public Utilities (HCDPU) under Phase 1 of the Anderson Creek Club Townhomes. The water and sewer lines in Phase 2 of the Anderson Creek Club Townhomes have not been approved yet. Phase 1 of the Anderson Creek Club Townhomes are served by six (6") inch water main that has been approved by HCDPU and the North Carolina Department of Environment and Natural Resources - Public Water Supply Section (NCDENR-PWSS) under Tracking # 04-00077. Sewer Public sewer is available for this development (via Harnett County) Comments: The new sewer collection lines installed on Hawk Ridge Drive were approved by Harnett County Department of Public Utilities (HCDPU) under Phase 1 of the Anderson Creek Club Townhomes. The sewer lines in Phase 1 of the Anderson Creek Club Townhomes were permitted under WQ0023512. The permit # WQ0023512 was certified by the PE in February 2007 and the sewer system may be placed into operation. The developer will not be allowed to record another map for the Anderson Creek Club – Townhomes (Phase 1) until Harnett County Department of Public Utilities (HCDPU) and North Carolina Department of Environment and Natural Resources - Division of Water Quality (NCDENR-DWQ) receive the PE Certification on the form that is found on the last page of the sewer collection system permit # WQ0023512 for that subdivision or phase. The correct PE Certification should be completed and submitted to HCDPU and NCDENR-DWQ. In addition, the PE Certification and As-Built Record Drawings have not been submitted to the NCDENR - Division of Water Quality (NCDENR-DWQ) and these documents should be forwarded to the attention of Trent Allen at the following address: North Carolina Department of Environment and Natural Resources - Division of Water Quality Fayetteville Regional Office Attn: Trent Allen 225 Green Street Suite 714 Fayetteville, NC 28301 The developer has tentatively made plans to request approval for the final plat at the next Harnett County Development Review Board meeting scheduled for February 14, 2007. The developer will be allowed to record the next map for this project. Should you have any questions concerning this information contained herein, then contact Tim Payseur at HCDPU at (910) 893-7575 extension 3275. Page 1 of 2 PUBLIC UTILITIES STAFF REPORT The sewer collection lines in Phase 2 of the Anderson Creek Club Townhomes have not been permitted with NCDENR-DWQ or approved by HCDPU. NOTE: HCDPU provides this information as a curteousy to the developer and professional engineer for design purposes. However, HCDPU cannot be held liable for errors, mistakes, ommissions, and inaccurate information provided through this preliminary approval process. It is therefore recommended that the engineer or developer "field verify" the information provided by HCDPU prior to purchasing, grading, excavating, clearing, or developing the subject property. HCDPU will not make provisions to extend new water lines to new developments at the county's expense and HCDPU will not provide assistance to upgrade, install or improve the new or existing water services in the proximity of this project unless the developer can provide HCDPU proper justification and demonstrate a benefit for Harnett County. Ballot REVIEWER: Tim Payseur Date: Feb. 14, 2007 VOTE: Conditionally Approve CONDITIONS: SHORT TERM: The professional engineer has submitted the As-Built Record Drawings and proper PE Certification for the sewer collection line(s) permit WQ0023512 to NCDENR-DWQ to release the Harnett County HOLD on this project. LONGE RANGE: The professional engineer must submit the plans, engineer's report, project specfications for the water and sewer collection line(s) in Phase 2 of the Anderson Creek Club Townhomes have not been permitted with NCDENR-DWQ or approved by HCDPU. Page 2 of 2 PUBLIC UTILITIES STAFF REPORT