Loading...
plan review sheet Date 2f 16 Plan Box# I I C C Job Name 1(( ((P, Plan Name — 31)1Wg1 App # UL\ H- Valuation. SQ Feet Garage gl Inspections for SFD/SFA Crawl_ Slab_ Mono_ Basement_ Footing Footing Plum Under Slab Footing Foundation Foundation Ele. Under Slab Foundation Address Address Address Waterproofing Open Floor Slab Mono Slab Plum Under slab Rough In Rough In Rough In Address Insulation Insulation Insulation Slab Final Final Final Open Floor Rough In Insulation Final Foundation Survey= Envir. Health )ifi Other Additions/Other • Footing Foundation_ V Siab ����j�p Mono= Open Floor_ Rough In_ Insulation Final