plan review sheet Date - 18
Plan Box# � Job Name c 1 J l I, 11+7
Plan Name
App# } ` 171 Valuation a2 o/ 3SD SQ Feet
Garage Ss'a
SSD
Inspections for SFD/SFA
Crawl_ Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final
Open Floor
Rough In
Insulation
Final
Foundation Survey_ Envir. Health eJ) I 5* Other
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final