Loading...
T18010.00_2018-06-04_JHGCheck Appropriate: Start Time:End Time:Time on Site: +Travel: +Report: +CPU: +Stand-by: Total: 1.4. 2.5. 3.6. 1. 2. 3. 1. 2. 3. 1.3. 2.4. 1210 Trinity Road | Suite 110 Cary, NC 27513 (919) 871-0800 (Office) INSPECTION DAILY REPORT Project Address: Campbell University - Wrestling Room Addition Buies Creek, NC T18010.00Date:Monday, June 04, 2018 Print:Justin Gerner Contractor Notified?Yes N/A Signed:Date:6/4/2018 Dec-15Rev: Comments: Was Re-Inspection performed? Re-Inspection Hours: N/A List Changes to Approved Plans Authorized by the Building Official and Architect or Engineer: 4.00 List Items Requiring Corrections: N/A List Corrections of Previously Listed Items: N/A 2.00 Falcon Project Number: List Test(s) Made: Project Name: Describe Inspections Made, Including Locations: Inspection Type(s):Structural Steel 9:00 AM 1.5010:30 AM Time Management: 0.50 0.00 0.00 Arrived on site as requested by the contractor to observe joist end welds and decking for the roof. The perimeter decking was not installed at this time. The installed decking was observed. The decking and joist end welds appeared to be installed in accordance with contract documents. Observed roof joist end welds and decking attachments to joists. Testing Continuous Periodic Y NInspection (A copy of this report is to remain at the job-site with the Contractor for review by the Building Department's Inspector upon request) Date: Project: Plan from Today's Inspections: Monday, June 04, 2018 Campbell University - Wrestling Room Addition Areas observed. (A copy of this report is to remain at the job-site with the Contractor for review by the Building Department's Inspector upon request) Date: Project: Photos from Today's Inspections: Monday, June 04, 2018 Campbell University - Wrestling Room Addition Joist End Weld Decking Observed (A copy of this report is to remain at the job-site with the Contractor for review by the Building Department's Inspector upon request)