Loading...
PLAN REIEW SHEET • Date (-049AS Plan Box# la Job Name 01041.11. Plan Name -------- ��[ App # li-� -a0 Valuation4tg4967 SQ Feet /tL79 Garage ��6/e� = _LLL Inspections for SFD/SFA/ Crawl V Slab_ Mono_ Basement_ Footing Footing Plum Under Slab Footing Foundation Foundation Ele. Under Slab Foundation Address Address Address Waterproofing Open Floor Slab Mono Slab Plum Under slab Rough In Rough In Rough In Address Insulation Insulation Insulation Slab Final Final Final Open Floor Rough In Insulation pI Final Foundation Survey No Envir. Health NON Other Additions/Other Footing_ Foundation_ Slab_ Mono_ Open Floor_ Rough In Insulation_ Final