PLAN REVIEW SHEET •
Date �9 (t4fr q1
Plan Box It 44I Job Name , WIQ4Id1431
G 'I
Plan Name
App k p 0 T J�7 Valuation -PI q 1360 SQ Feet _
Garage VfoC.
= a/ -7 sl
Inspections for SFD/SFA /
Crawl_ Slab_ Mono V Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
,, II Final
A
Foundation Survey ,I .S Envir. Health�UN Other
Additions/ Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final