PLAN REVIEW SHEET Date COIF lel g
Plan Box# C4_0 Job Name LLOV- �C� up rn �}�,
LIL-
Plan Name J
App# vl 3 Ce 1 Valuation 137, Lit)- SQ Feet
Garage 9 yle
,_s1co3
Inspections for SFD/SFAsf
Crawl \/ Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor ' Slab Mono Slab Plum Under slab
Rough In Rough In - Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey I�_CO Envir. Health�_ Other
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_