Loading...
PLAN REVIEW SHEET Date LW/ 3/l Plan Box# Job NameCASsin/1n (rr s ,�9Cocr-l0 Plan Name App# L SOO Valuation;QS, 3a 0 SQ Feet a, 110 Garage — = 21,1 /0 Inspections for SFD/SFA Crawl_ Slab V/ Mono_ Basement_ Footing - Footing Plum Under Slab Footing Foundation Foundation Ele.Under Slab Foundation Address Address Address Waterproofing Open Floor ' Slab Mono Slab Plum Under slab Rough In Rough In - Rough In Address Insulation Insulation Insulation Slab Final Final Final Open Floor Rough In Insulation .yn1 Final Foundation Survey o Envir. Health 1 Y1. Other Additions/Other Footing Foundation_ Slab_ Mono_ Open Floor_ Rough In Insulation_ Final_