PLAN REVIEW SHEET Date LW/ 3/l
Plan Box# Job NameCASsin/1n (rr s ,�9Cocr-l0
Plan Name
App# L SOO Valuation;QS, 3a 0 SQ Feet a, 110
Garage —
= 21,1 /0
Inspections for SFD/SFA
Crawl_ Slab V/ Mono_ Basement_
Footing - Footing Plum Under Slab Footing
Foundation Foundation Ele.Under Slab Foundation
Address Address Address Waterproofing
Open Floor ' Slab Mono Slab Plum Under slab
Rough In Rough In - Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
.yn1 Final
Foundation Survey o Envir. Health 1 Y1. Other
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_