Loading...
FM DOCUMENTS ,r Harnett T(--• COUNTY *A OW fans,Senior ao.erwr VP' "IPE lse wdumwr W Plan Review, Inspection, and Permit Fees Application Number . 18-soosszoo $100.00 ❑ DRB Major Sub Division Prelim Site Plans $ - $200.00 0 Explosive Material (90 Days) $ - $100.00 0 Explosive Materials (72 Hours) $ - $100.00 0 Fireworks Public Display $ - $50.00 ❑ Final Inspection $ - $35.00 +$2.00 per device ❑ Fire Alarm Testing $ - $35.00 +$2.00 per nozzle ❑ Fixed Fire Suppression $ - $75.00 0 Insecticide Fog/Fumigation $ - $100.00 ❑ Pipe Test/UST/AGST $ - $50.00 ❑ Plans up to 5000 sq ft $ - $100.00 0 Plans 5001 sq ft to 10,000 sq ft $ - $150.00 0 Plans 10,001 sq ft to 25,000 sq ft $ - $250.00 ❑ Plans 25,001 sq ft and over $ - $35.00 +2.00 per head o Sprinkler Certification Test $ 35.00 $50.00 D Standpipe Testing $ - $50.00 ❑ Special Assembly (ie.amusement buildings,carnivals,fairs) $ - $75.00 0 Tents/Canopies/Air Supported Structure $ - $100.00 ❑ Tank Installation (charge for each tank) $ - $100.00 0 Tank Removal (charge for each tank) $ - 4 Total Devices/Heads $ 8.00 Total Cost $ 43.00 Code Enforcement Official D. Banks Wallace 6/12/2018 Harnett R� COUNTY * (` rr,..aOn v Application for ��''Plan Review Application# r) - nW 4U 2,0(/ SPeinyitt Date Received: V/ • 4 I V Received By: aufLS/f 1 'Poo Name of Project: 'rLQ1-1 ©`t/(tee. Ut-141 Physical Address of Project: 03 `. i •d CIL 5 7 i tc-L AfFrinw1 ..___ _..NC Z7Se(�_ Plans Submitted By: 4.0(c) tV 1 tare Project Phone: ( 410 )- 3Iq - :3002 Contact Person/Address: _l nib efe 'Ti¢ C4L to Contact Phone: ( q)10 )-D7P, - ()co ( )- - ContractorsNanmiInfo: _64((04.4-81-4 leC_ rE(�>re" flb(C A)o /3C. x`633t1 Contractor's Phone: ( 41/0 p ffYL- (lad • Plans that are submitted will be reviewed as quickly as possible with an average time of review between 7-10 working days. • Status checks may be conducted on plan reviews by visiting the website http://hteweb.harnett.org/Click2GovBP/Index.jsp or by calling the Harnett County Central Permitting Office(910-893-7525,Option 42), or the Harnett County Fire Marshal's Office(910-893-7580). • Approved plans must be picked up from the Central Permitting Office and all fees paid before any required inspections can be conducted. if!�,I Carolina Fire Protection, Inc. P.O. Box 250 Phone: (910) 892-1700 Dunn, NC 28335 Fax: (910) 892-7322 Transmittal Lotter This correspondence may contain confidential information intended for the use of the individual or entity to whom it is addressed If the reader is not the intended recipient or the employee or agent responsible to deliver it to the intended recipient you are hereby notified that any dissemination or copying is strictly prohibited. Date 6-1-2018 To Harnett County Central Permitting 108 E. Front Street Lillington, NC 27546 Attention Plan Review— From Kevin Wilder Subject Esterline Office up-fit 608 E. McNeil St. Lillington, NC #SETS PAGES DESCRIPTION APPROVAL FOR YOUR USE INFORMATION RECORDS OTHER 3 FP1 Sprinkler x I Permit App x MAILED H FED EX Cl UPS LiHAND DELIVERED ✓ PLEASE RETURN (1) COPY OF DRAWINGS MARKED WITH YOUR STAMP OF APPROVAL AND/OR COMMENTS REMARKS: „ Harnett -�� COUNTY * > ..s.. �FM M . a.•,in—t k(iV l'- f!P - NM1 �JIFfMIt. Fire Marshal Division June 12, 2018 Kevin Wilder 608 E. McNeil St. Lillington,NC 27546 RE: Esterline Office Up-fit Application Number 18-50044200 Mr. Wilder, Thank you for submitting the sprinkler system plans for the sprinkler alterations. The plans have been carefully reviewed by a qualified code enforcement official to examine for compliance with the North Carolina Fire Prevention Code and all other fire protection regulatory documents. There are some items that were found during the plan review process that need to be addressed before a final inspection of the new facility can be given. These items are outlined and described below. • Plan Review Comments to Contractor. o Installation of the sprinkler system shall be per contract specifications and NFPA 20013 edition. o Provide an FDC detail on the plans, also,the type and size indicated. o Provide hydraulic design data plate, spare sprinklers and wrench cabinet, and approved signage at final inspection per NFPA 13. • 901.2.1 Statement of Compliance. o Before requesting final approval of the installation, where required by the fire code official, the installing contactor shall furnish a written statement to the fire code official that the subject fire protection system has been installed in accordance with the manufacture's specifications and the appropriate installation standard. Any deviations from the design standards shall be noted and copies of the approvals for such deviations shall be attached to the written statement. • 903.2.6.1 Dry Pipe System. Harnett —Z� c o u tt r r * A E- �.�•m•�•••�•-* shomettary o When dry-pipe sprinkler systems are installed, upon activation a full flow of water shall be delivered to the most remote point of the system in no more than 60 seconds. Provide further design details and information on amended sprinkler drawings for quick opening device to meet the above requirement. • 903.4 Sprinkler system monitoring and alarms. o All valves controlling the water supply for automatic sprinkler systems and water-flow switches on all sprinkler systems shall be electrically supervised according to the NC State Fire Code. • 901.S Installation acceptance testing. o All piping and attached appurtenances subjected to system working pressure shall be hydrostatically tested at 200 psi or 50 psi in excess of the system working pressure, whichever is greater, and shall maintain that pressure without loss for 2 hours. This test is required to be witnessed by a representative from the Harnett County Fire Marshal's Office. o A contractor's material and test certificate shall be furnished by the trained representative of VSC Fire &Security before approval. o A piping and hanger inspection is required before closure of ceiling system(s). o A sprinkler final inspection is required at completion of project. o Schedule all inspections with the Fire Marshal's Office. o (910)984-4003 • 912.4 Fire Department Connection Signage. o Automatic sprinkler,test connection and standpipe signs to be properly installed. Thank you again for submitting the plans for the sprinkler up-fits. Please review the plans and adhere to any notes and alterations that were made in addition to the original drawings. These remarks are for the plans that were submitted and its original intent. These remarks do not apply if the original intent changes or what was submitted on the above date changes. If you have any questions, please do not hesitate to call this office. Sincerely, a 6.4 ,3 D. Banks Wallace Chief Deputy Fire Marshal