Loading...
PLAN REVIEW SHEET // Date W C 1r �. 1 6 Plan Box p lG Job Name N SP (MS; Plan Name App# U-4 I W ✓ Valuation -971 ae& SQ Feet 31103 Soon a1 ex&uiresom arage II ool = 6111P-- inspections for SFD/SFA Crawl_ Slab J Mono_ Basement_ Footing Footing Plum Under Slab Footing ` Foundation Foundation Ele. Under Slab Foundation Address Address Address Waterproofing Open Floor Slab Mono Slab Plum Under slab Rough In Rough In Rough In Address Insulation Insulation Insulation Slab Final Final Final Open Floor Rough In Insulation / p Final Foundation Survey 1/ Envir. Healtl Ct Other Additions/Other Footing • Foundation_ Slab_ Mono_ Open Floor_ Rough In_ Insulation_ Final