PLAN REVIEW SHEET 6
Date C1ae,�1k
Plan Box# Job Name l�
Plan Name
I lot Olay
App# q tk(c?6 Valuation SQ Feet liao9
Garage alb
= 114ac-
Inspections for SFD/SFA
Crawl_ Slab_ Mono Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey /_ Envir. Health V Other
Additions / Other
Footing
Foundation
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_