plan review sheet �lDate 5--31 'ig
Plan Box# A-As Job Name V[655 HrW�U1 ode 6,
Plan Name
APP# Ll30Valuationn?3 , 1 SQ Feet ___
Garage `{41
075-
Inspections
SInspections SFD/SFA
Crawl_ Slab__ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele.Under Slab Foundation
Address Address Address Waterproofing
Open Floor ' Slab Mono Slab Plum Under slab
Rough In
Rough In - Rough In Address
Slab
Insulation Insulation Insulation
Final Final Open Floor
Final Rough In
Insulation
Final
Foundation Survey Envir. Health Nn1 1 \ Other
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_