PLAN REVIEW PLAN Date 50-P-/ l(
Plan Box# h e- Job Name M.LCt( Gntcc k
Plan Name
App# Y b 9 Valuations 2SW SQ Feet
Garage a.SW
Inspections forSFD/SFA
Crawl_ Slab_ Mono_ Basement___
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor ' Slab Mono Slab Plum Under slab
Rough In Rough In - Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
�
(� Final
Foundation Survey 146 Envir. Health '&I S Other
A50 at faC
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_