Loading...
INSPECTION W/ ENG LETTER PREPARED 5/08/18, 14:03 :33 INSPECTION TICKET PAGE 34 '$arnett County INSPECTOR: IVR DATE 5/09/18 ADDRESS . : 194 COUNTRY MEADOW LN SUBDIV: MEADOW LANE SUBDIVISION CONTRACTOR : PHONE : OWNER . . : WILLIAMS WENDY L & GIULIANO PHONE : PARCEL . . : 07-0589- - -0100- -17- APPL NUMBER: 18-50043405 CP NEW RESIDENTIAL (SFD) DIRECTIONS : T/S: 02/27/2018 08:24 AM DJOHNSON -- 421 TO BRICK MILL RD LEFT ON BRICK MILL RD GO 4 MILES TAKE LEFT ON COUNTRY MEADOW LN. PROPERTY IS IN BACK OF CULDESAC. T/S: 05/04/2018 01:15 PM JBROCK ---- premise # 76719141 STRUCTURE: 000 000 83X108 3 BR 3 HTB ATT GARAGE DECK CRAWL FLOOD ZONE - FLOOD ZONE X # BATHS - 3 # BEDROOMS - 3 .00 PROPOSED USE - SFD SEPTIC - EXISTING' • NEW WATER SUPPLY • NEW WELL PERMIT: CPSF 00 CP * SFD REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS A614 01 3/27/18 SB ADDRESS CONFIRMATION TIME: 17:00 VRU #: 003106713 3/29/18 AP 194 COUNTRY MEADOW LN COATS 27521 T/S: 03/29/2018 03 :27 PM SBENNETT 8101 01 3/28/18 DT R*BLDG FOOTING / TEMP SVC POLE TIME: 17:00 VRU #: 003106739 3/28/18 AP T/S: 03/26/2018 03:00 PM BPETRICH T/S: 03/26/2018 03:01 PM BPETRICH T/S: 03/28/2018 01:09 PM DETAYLOR B103 01 4/26/18 DT R*BLDG FOUND & TEMP SVC POLE TIME: 17:00 VRU #: 003118908 4/26/18 AP T/S: 04/25/2018 01:35 PM LLUCAS AND T-POLE T/S: 04/26/2018 03:41 PM DETAYLOR B105 01 5/09/188 TI R*OPEN FLOOR TIME: 17:00 VRU #: 003125036 579//15, �l-yr T/S: 05/08/2018 11:25 AM DJOHNSON COMMENTS AND NOTES OrtjDS CONSULTING&DESIGN 8600'D'Jersey Ct (P)(919)492-7036 Raleigh,NC 27617 (F)(866)792-5107 Finn Lic.Na:P-0961 William Smith May 8,2018 W.D.Smith Construction PO Box 148 Willow Springs,NC 27592 wdsmithlle@live.com Subject: Framing Items Location: 190 Country Meadow Ln.(Apex,NC) Project No: TGS 181995 Review Date: 5/8/2018 We are pleased to provide the evaluation of the subject and location referenced above. Observations: Builder has requested the review of the following: -The CMU wall at the front right corner of the house was laid out 1'short per the plans.2x 10 floor joists span approximately 10.5'with a I'cantilever and are spaced 16"O.C.Builder has installed 2x10 blocking in between the joists over the CMU wall. Recommendations: Based on our on-site observations and review: -The floor joists referenced above are adequate as-is to support the anticipated loading conditions.No further action is required. If you have any questions or if I can be of further assistance to you on this project,please contact me at(919)280-2845 / Respectfully Submitted, 9 Tyler Blackwell = a SEAL - IDS Consulting&Design,PLLC 5 `, 75 ' 2 Reviewing Engineer: Elijah B.Smith,P.E. „✓q/{ B. 54,.° www.jdsdesignonline.com 1 tblackwell@jdsdesignonline.com