PLAN REVIEW SHEET Date S I( n I (r
Plan Box # I/1 I Q_ Job Name \\\_i ✓f1
Plan Name
App# 3�p Valuation a0cl, QST SQ Feet 07 /'g '
Garage if (!S
=
Inspections for SFD/SFA
Crawl J Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey \/ Envir. Health_ Other
Additions/ Other
Footing_
Foundation
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final