APPROVED FM PLANSA
Date Received:
Name of Project:
Physical Address of Project:
f r�
Application for Plan Review
plication # -
Received By:
/ NC
Plans Submitted By:
Project Phone:
Contact Person/Address:
t MI"4ncyStrvsces [icpar-tment
Contact Email: !,' J �„
Contact Phone:
Contractor'sNamelinfo: f/fir► 1 J , �,ts<J-1) ( not
Contractor's Phone:
w*-N.harn,ett.cag
• Plans that are submitted will be reviewed as quickly as possible with an average time of review
between 7-10 working days,
• Status checks may be conducted on plan reviews by visiting the website
http://hteweb.harnett.org/Click2GovBP/Index.'sp or by calling the Harnett County Central Permitting
Office (910-893-7525, Option #2), or the Harnett County Fire Marshal's Office (910-893-7580).
• Approved plans must be picked up from the Central Permitting Office and all fees paid before any
required inspections can be conducted.
Harnett AL
Fire Marshal Division
April 20, 2018
Troy White
2110 Concord Street
Durham, N.C. 27707
Re: Buffalo Lake Medical
85 Mattie Haddock Drive
Cameron, NC 228326
Application Number 18-50043826
Mr. White,
Thank you for submitting the plans for the Buffalo Lake Medical Upfit. The plans have
been carefully reviewed by a qualified code enforcement official to examine for
compliance with the North Carolina Fire Prevention Code and all other fire protection
regulatory documents. There are some items that were found during the plan review
process that need to be addressed before a final inspection of the new facility can be
given. These items are outlined and described below.
• 906.1 Fire Extinguishers
o Minimum of (1) 2A10:BC fire extinguisher shall be installed not to exceed
75' distance of travel.
o All Fire extinguishers shall be properly mounted and tagged by a fire
extinguisher company.
• 1006.1 Means of Egress Illumination
o The means of egress, including the exit discharge, shall be illuminated at
all time the building space is served by the means of egress is occupied.
o Means of egress consist of three separate and distinct parts: the
exit access, the exit and the exit discharge.
o The means of egress illumination shall not be less than 1 foot-candle at
the walking surface.
• 105.7.1 Automatic fire -extinguishing systems.
Harnett..
AMMW-haT"tt.0-,q
o A construction permit is required for the fire sprinkler system installation
before any such work commences. Submit complete construction
documents that include the hydraulic calculations for the system. The
system shall also be designed consistent with the architectural design
documents and specifications. Construction documents shall include
detail as described in NFPA 13 standard for automatic sprinkler system
installation. Contractor must obtain construction permit for the fire
sprinkler system before commencement of any work.
■ A rough in inspection is required.
■ A final acceptance test is required.
• 901.2.1 State of Compliance.
o Before requesting final approval of the installation, where required by
the fire code official, the installing contactor shall furnish a written
statement to the fire code official that the subject fire protection system
has been installed in accordance with the manufacture's specifications
and the appropriate installation standard. Any deviations from the design
standards shall be noted and copies of the approvals for such deviations
shall be attached to the written statement.
• Notes
o A final fire inspection is required.
o Schedule all fire inspections through the Fire Marshal's Office.
(919)893-0743
Thank you again for submitting the plans for the upfit. Please review the plans and
adhere to any notes and alterations that were made in addition to the original drawings.
These remarks are for the plans that were submitted and its original intent. These
remarks do not apply if the original intent changes or what was submitted on the above
date changes. If you have any questions, please do not hesitate to call this office.
Sincerely,
Roger Sullivan
Deputy Fire Marshal
Harnett
1 11 1 ; A
il c.
Plan Review, Inspection, and Permit Fees
Application Number
18-50043826
$100.00
❑
DRB Major Sub Division Prelim Site Plans
$ -
$200.00
❑
Explosive Material (90 Days)
$ -
$100.00
❑
Explosive Materials (72 Hours)
$ -
$100.00
❑
Fireworks Public Display
$ -
$50.00
E
Final Inspection
$ 50.00
$35.00 + $2.00 per device
❑
Fire Alarm Testing
$ -
$35.00 + $2.00 per nozzle
❑
Fixed Fire Suppression
$ -
$75.00
❑
Insecticide Fog/Fumigation
$ -
$100.00
❑
Pipe Test/UST/AGST
$ -
$50.00
121
Plans up to 5000 sq ft
$ 50.00
$100.00
❑
Plans 5001 sq ft to 10,000 sq ft
$ -
$150.00
❑
Plans 10,001 sq ft to 25,000 sq ft
$ -
$250.00
❑
Plans 25,001 sq ft and over
$ -
$35.00 + 2.00 per head
❑
Sprinkler Certification Test
$ -
$50.00
❑
Standpipe Testing
$ -
$50.00
❑
Special Assembly
(ie. amusement buildings, carnivals, fairs)
$ -
$75.00
El
Tents/Canopies/Air Supported Structure
$100.00
Tank Installation (charge for each tank)
$100.00
❑
Tank Removal (charge for each tank)
$ -
Total Devices/Heads
$ -
Tota l Cost
$ 100.00
Code Enforcement Official
Roger Sullivan
4/20/2018