PLAN REVIEW SHEET (1,
ll �f Date (VT/ I
Plan Box a 1 , l Job Name 19VIA `' " 2 &i/ :3
PlanName (thrlO
App# I 'SON-137)O Valuationk li ( 3 ; SQ Feet /4/2
Garage (RV
Inspections foi SFD/SFA
Crawly/ Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele.Under Slab Foundation
Addrest Address Address Waterproofing
Open Floor ' Slab Mono Slab Plum Under slab
Rough In Rough In - Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
��
Foundation Survey Envir. HealtP
((
Other
Additions/Other
Footing
Foundation_
Slab_
Mono
Open Floor_
Rough In
Insulation_
Final