PLAN REVIEW SHEET Date 4I I t r/r15'
Plan Box# A11 1 Job Name H. 4- tt
Plan Name
App# i-}3 2S7 Valuation /Yo/°lafj SQ Feet / y69
Garage VDV
_ /_fid
Inspections forSFD/SFA
Crawl_ Slab Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey ✓ Envir. Health_ Other
Additions/ Other
Footing
Foundation
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final