PLAN REVIEW SHEET I Date /I 2--/ 1
Plan Box if Q(U Job Name Field Y✓'h
Plan Name in e. {1t)5M1
App# 4 31 P' Valuation 427D(9169 SQ Feet 4g//
Garage Ug
= 330/
Inspections for SFD/SFA
Crawl V Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele.Under Slab Foundation
Address Address Address Waterproofing
Open Floor ' Slab Mono Slab Plum Under slab
Rough In Rough In - Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey +-S Envir. Health Other
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_