Loading...
PLAN REVIEW SHEET C Date (-4/1 Plan Box# \ Job Name Mw1t tIci/ o-e 1 tai vvu'I+ S Plan Name 1 1 Imp- App # vl 311 DValuation$2K�f SQ Feet 6/0115- Garage /0115Garage Stas • = 14/o geiSif Inspections for SFD/SFA / u RN Led Crawl Slab_ Mono_ Basement V Footing Footing Plum Under Slab Footing Foundation Foundation Ele.Under Slab Foundation Address Address Address Waterproofing Open Floor ' Slab Mono Slab Plum Under slab Rough In Rough In - Rough In Address Insulation Insulation Insulation Slab Final Final Final Open Floor Rough In Insulation p �, �p Final Foundation Survey 1. QS Envir. Healtld=° / Other Additions I Other Footing Foundation_ Slab_ Mono,__ Open Floor_ Rough In Insulation_ Final_