PLAN REVIEW SHEET Date u1/3/ l b
Plan Box# T I Job Name g /Th
Plan
�Name
App# G3 1 l I Valuation` 3- )7o SQ Feet 62 t&'`/
Garage 701
' = 3/.b
Inspections for SFD/SFA
Crawl✓ Slab__ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele.Under Slab Foundation
Address Address Address Waterproofing
Open Floor ' Slab Mono Slab Plum Under slab
Rough In Rough In - Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey NO Envir. Health U{.(JJ Other
Additions /Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough in
Insulation_
Final_