Loading...
PLAN REVIEW SHEET • I / Date 301?-/ IPlan Box BOC Job Name fictdom Cnt G `s 1" C' Plan Name acifd1!SVf App it l o 5Q° — Valuation ib141 1.11C) S4 Feet / 7/0 Garage 65/ Inspections for SFD/SFA Crawl Slab_ Mono_ Basement_ Footing Footing Plum Under Slab Footing Foundation Foundation Ele.Under Slab Foundation Address Address Address Waterproofing Open Floor ' Slab Mono Slab Plum Under slab Rough In Rough In - Rough In Address Insulation Insulation Insulation Slab Final Final Final Open Floor Rough In Insulation Final rfS ^ / Foundation Survey ` " Envir. Health 1=�{- Other Additions/Other Footing Foundation_ • Slab_ Mono_ Open Floor_ Rough In Insulation_ Final