PLAN REVIEW SHEET Date 5 1)1 ( I
I
Plan Box#
1/4.-/C Job Job Name tk
Plan Name \frAr 01)
App# 3) 7 4' Valuation
chldrit SQ Feet /7(7
Garage
a
Inspectionsnsfor SFD/SFA
Crawl V Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor ' Slab Mono Slab Plum Under slab
Rough In Rough In - Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey i\l O Envir. Health �^ (( ppp��f 1�r))) Other
6-001 (-
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final