PLAN REVIEW SHEET Date ✓ia l l z
A LihMfd
Plan Box q ,_,A--) Job Name
Plan Name .E i'I✓L
App# 3°�1J ValuatioI/J7t 7cJ SQ Feet (1,1?-
Garage 9I7
' = Pte
Inspections for SFD/SFA
Crawl V Slab__ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor ' Slab Mono Slab Plum Under slab
Rough In Rough In - Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
W.°
Foundation Survey Envir. Health Other
Additions/Other
Footing
Foundation__
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final