PLAN REVIEW SHEET Date 3/02 ),/ /
Plan Box itJob Name •
-I��_n r V i tf •.
Plan Name I r 5-&\\n
App St Li 1 Valuation4I V? ,k t SQ Feet /6°3
Garage lag
= dv/2
Inspections for SFD/SFA
Crawl / Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor ' Slab Mono Slab Plum Under slab
Rough In Rough In - Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
NiFinal
Foundation Survey' ) Envir. Health `�' Other
Additions/Other
Footing_
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final