PLAN REVIEW SHEET Date ( ! •
Plan Box# � ( Job Name j5I 4I (6, .11x(11(
Plan Name
App # HaP 4 Valuation 28/ V/ir SQ Feet —
Garage Mg
Inspections for SFD/SFA
Crawl_ Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
a Final
Foundation Survey= Envir. Health Si me
Additions /Other ki Ct
Footing • 2
Foundation C /1 �k/l� u� LC
Slab_ I J
Mono_
Open Floor_
Rough In
Insulation_
Final