PLAN REVIEW SHEET Date 3/ )H17
Plan Box# 0 1 Job Name SM6 tC(si(Yl IPropc ttS
Plan Name PP-r) I rir"
App# �'il 4° u Valuation/0, a �
0V8 SQ Feet , I
Garage �tici(
•
Inspections for SFD/SFA
Crawl , /_ Slab v Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele.Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In - Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
DC �r Final
J
Foundation Survey. 1, Envir. Health IV tuJ Other
Additions /Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final