Loading...
DOCUMENTS InitialApplication Date:3l6/2018 App 8 50OW- Si 1 lication# `s�� �—r 5 CU# COUNTY OF HARNETT RESIDENTIAL LAND USE APPLICATION Central Permitting 108 E.Front Street,Lillington,NC 27546 Phone:(910)893-7525 ext:2 Fax:(910)893-2793 www.harneh.org/permits -'A RECORDED SURVEY MAP,RECORDED DEED(OR OFFER TO PURCHASE)&SITE PLAN ARE REQUIRED WHEN SUBMITTING A LAND USE APPLICATION'- LANDOWNER:Timothy Britton Mailing Address:3109 NC 210 N City: Lillington State:NC Zi 27546 Contact No: 919-669-6798 Email: britton.tj@gmail.com APPLICANT`:Emerald Energy(John Leoanrd) PO Box 99031 Mailing Address: City: Raleigh State:NC Zip:27624 Contact No: 919-247-3670 Email: tohnleonard@emeraldenergyn< 'Please fill out applicant information if different than landowner CONTACT NAME APPLYING IN OFFICE:John LeonaarrddL _ /�I,, _ Phone#919-247-3670 PROPERTY LOCATION:Subdivision:s 121 Olki+YIYJ. .3S Lot#: ^ Lot Siey I• 13 RL. State Road#3155 State Road Name: NC 210 N Map Book&Page: (7T-S Parcel: 110661 0034 01 0661-04-3928.000 qq /yy � PIN: Zoningl\ ti's° Flood Zone: WA Watershed:SActuw Deed Book&Page: 3336 / 0871 Power Company': Duke Energy Progress 'New structures with Progress Energy as service provider need to supply premise number from Progress Energy. Watershed: Cape Fear River(Lillington)Class-WS-IV,Cape Fear River(Dunn)Class-WS-IV PROPOSED USE: Monolithic ❑ SFD:(Size—x-1#Bedrooms'._#Baths:_Basement(w/wo bath):_Garage:_Deck:_Crawl Space:_Slab:_Slab:_ (Is the bonus room finished?(_)yes L)no w/a closet?(_)yes (_)no(if yes add in with#bedrooms) ❑ Mod:(Size x )#Bedrooms_if Baths_Basement(w/w°bath)—Garage: Site Built Deck:_ On Frame Off Frame_ (Is the second floor finished?(_)yes (_)no Any other site built additions?( )yes (J no ❑ Manufactured Home:. SW_DW__TW(Size x )#Bedrooms:_Garage:_(site built? )Deck: (site built? ) ❑ Duplex:(Size x )No.Buildings: No.Bedrooms Per Unit: ❑ Home Occupation:#Rooms: Use: Hours of Operation: #Employees:_ Addition/Accessory/Other:(Size 31 x 12' Grid Tied,Roof Mounted Solar Array (_J yes (� a ry 1 Use'. Closets in addition? no Water Supply: County Existing Well New Well(#of dwellings using well )'Must have operable water before final Sewage Supply: New Septic Tank(Complete Checklist) Existing Septic Tank(Complete Checklist County Sewer Does owner of this tract of land,own land that contains a manufactured home within five hundred feet(5001 of tract listed above?(_)yes (_)no Does the property contain any easements whether underground or overhead( )yes (_)no Structures(existing or proposed):Single family dwellings: Manufactured Homes: Other(specify): Roof Mounted, Grid Tied, Solar, - 17 Panels Required Residential Property Line Setbacks: Comments: Front Minimum Actual Rear Closest Side Sidestreet/comer lot Nearest Building on same lot Residential Land Use Application Page 1 of 2 03111 APPLICATION CONTINUES ON BACK SPECIFIC DIRECTIONS TO THE PROPERTY FROM LILLINGTON: North on NC 210 N. house on right hand side. If permits are granted 1 agree to conform to all ordinances and laws of the State of North Carolina regulating such work and the specifications of plans submitted. I hereby state that foregoing statements are accurate and correct to the best of my knowledge. Permit subject to revocation if false information is provided. John Leonard 3/6/2018 gr.g. Signature of Owner or Owner's Agent Date "'It is the owner/applicants responsibility to provide the county with any applicable Information about the subject property,including but not limited to:boundary information,house location,underground or overhead easements,etc.The county or its employees are not responsible for any incorrect or missing information that is contained within these applications."' "This application expires 6 months from the initial date if permits have not been issued" Residential Land Use Application Page 2 of 03/11 09/09111 Application# Harnett County Central Permitting Each eecbon below to be hXstl outPO Box 85 Langton NC 27546 by whomever Performing work 910 893 7525 Fax 910 893 2793 www hamelt mg/permits Must be owner or licensed contractor Address company Application for Residential Building and Trades Permit name 8 phone must match Owners Name Timothy Britton Date 3/6/2018 Site Address 3155 NC Hwy 210 N Lillington, NC 27546 phone 919-669-6798 Directions to job site from Lillington Head North on 210, house on right Subdivision Lot Description of Proposed Work Grid Tied, Roof Mounted Solar Array #of Bedrooms Heated SF Unheated SF Finished Bonus Room/ Crawl Space _Slab General Contractor Information Emerald Energy 919-247-3670 Building Contractor s Company Name Telephone PO Box 99031, Raleigh, NC 27624 johnleonard@emeraldenegync.com Address Email Address 69879 License# Electrical Contractor Information Description of Work Solar Tie In Service Size _Amps T-Pole _Yes_No Wiring Solutions Plus 919-795-8291 Electrical Contractors Company Name Telephone 4509 Meadow Pine Drive, Knightdale, 27545 wiringsolutionsplus@yahoo.com Address Email Address 25181 License# Mechanical/HVAC Contractor Information[ Description of Work Mechanical Contractors Company Name Telephone Address Email Address License# plumbing Contractor Information Description of Work #Baths Plumbing Contractors Company Name Telephone Address Email Address License# Insulation Contractor Information Insulation Contractors Company Name&Address Telephone *NOTE General Contractor must fill out and sign the second page of this application I hereby certify that I have the authority to make necessary application that the application is correct and that-the construction will conform to the regulations in the Building Electrical Plumbing and Mechanical codes and the Harnett County Zoning Ordinance I state the information on the above contractors is correct as known to me and that pv manna below I have obtained all subcontractors permission to obtain these permit}and if ate(changes occur including listed contractors site plan number of bedrooms building and trade plans Environmental Health permit changes or proposed use changes I certify it is my responsibility to notify the Harnett County Central Permitting Department of any and all changes EXPIRED PERMIT FEES-0 Months to 2 years permit re-issue fee is$150 00 After 2 years re-issue fee is as per current fee schedule 3/6/2018 Leonard "— Signature of Owner/Contractor/Officer(s)of Corporation Date Affidavit for Worker's Compensation N C G S 87-14 The undersigned applicant being the k General Contractor _Owner Officer/Agent of the Contractor or Owner Do hereby confirm under penalties of perjury that the person(s) firm(s)or corporation(s)performing the work set forth in the permit Has three(3)or more employees and has obtained workers compensation insurance to cover them _Has one(1)or more subcontractors(s)and has obtained workers compensation insurance to cover them k Has one(1)or more subcontractors(s)who has their own policy of workers compensation insurance covering themselves _Has no more than two(2)employees and no subcontractors While working on the project for which this permit is sought it is understood that the Central Permitting Department issuing the permit may require certificates of coverage of workers compensation insurance prior to issuance of the permit and at any time during the permitted work from any person firm or corporation carrying out the work Company or Name Emerald Energy Sign wdNew LeorQMTer -... Date 3/6/201 Interconnection Request Application Form for Interconnecting a Certified Inverter-Based Generating Facility No Larger than 20 kW This Interconnection Request Application Form is considered complete when it provides all applicable and correct information required below. Additional information to evaluate the Interconnection Request may be required. Processing Fee A non-refundable processing fee of $100 must accompany this Interconnection Request Application Form. If the Interconnection Request is submitted solely due to a transfer of ownership of the Generating Facility, the fee is $50. Interconnection Customer Name: Timothy Britton Contact Person: Timothy Britton Email Address: britton.tj@gmail.com Address: 3109 NC 210 N City: Lillington State: NC Zip: 27546 County: Harnett Telephone (Day): 9196696798 (Evening): Fax: Contact(if different than Interconnection Customer) Name: John Leonard Email Address: johnleonard@emeraldenergync.com Address: 8673 Harps Mill Rd City: Raleigh State: NC Zip: 27615 County: Wake Telephone (Day): 9192473670 (Evening): Fax: • Owner(s) of the Generating Facility: 1 NC 20 kW Inverter Generating Facility Information Facility Location (if different from above): Address: 3155 NC 210 N City: Lillington State: NC Zip: 27546 County: Harnett Utility Duke Energy Progress Account Number: 7340215370 For photovoltaic sources only: Inverter Manufacturer: Inverter: 1 x SolarEdge Technologies 7.6 kW Model: (Model SE7600H-US (240V)) Total panel capacity: Inverter Rating (ea): 7.616 kW AC Efficiency: 99% Nameplate Rating (each inverter): PV Module Array: 17 x Silfab 310W(Model SLA310M) Module Rating (ea): 310 W DC, 279.8 W PTC Tilt: 27 Azimuth: 230 Tracking: Fixed Nameplate Rating: 5.27 kW DC AC Rating: 4.709 kW CEC-AC Estimated Annual Production: 6808 kWh Design Factor: 86.6 % 7.6 kVA(Ac) (each inverter) 240 Volts(Ac) (each inverter) Phase: Single Phase System Design Capacity: 5.27kVA(Ac) Maximum Physical Export kW(Ac) Capability Requested: Prime Mover Photovoltaic ENERGY SOURCE TABLE Renewable Non-Renewable H-1. Solar— Photovoltaic Is the equipment UL 1741 Listed? 2 NC 20 kW Inverter If Yes, attach manufacturer's cut-sheet showing UL 1741 listing Estimated Installation Date 3/19/2018 Estimated In-Service Date 4/4/2018 The 20 kW Inverter Process is available only for inverter-based Generating Facilities no larger than 20 kW that meet the codes, standards, and certification requirements of Attachments 3 and 4 of the North Carolina Interconnection Procedures, or the Utility has reviewed the design or tested the proposed Generating Facility and is satisfied that it is safe to operate. List components of the Generating Facility equipment package that are currently certified: Number Equipment Type Certifying Entity 1. 2. 3. 4. 5. 3 NC 20 kW Inverter Interconnection Customer Signature I hereby certify that, to the best of my knowledge, the information provided in this Interconnection Request Application Form is true. I agree to abide by the Terms and Conditions for Interconnecting a Certified Inverter-Based Generating Facility No Larger than 20 kW and return the Certificate of Completion when the Generating Facility has been installed. Signed: Title: Date: 4 NC 20 kW Inverter Terms and Conditions for Interconnecting a Certified Inverter-Based Generating Facility No Larger than 20 kW 1.0 Construction of the Facility The Interconnection Customer (Customer) may proceed to construct (including operational testing not to exceed two hours) the Generating Facility when the Utility approves the Interconnection Request and returns it to the Customer. 2.0 Interconnection and Operation The Customer may interconnect the Generating Facility with the Utility's System and operate in parallel with the Utility's System once all of the following have occurred: 2.1 Upon completing construction, the Customer will cause the Generating Facility to be inspected or otherwise certified by the appropriate local electrical wiring inspector with jurisdiction, and 2.2 The Customer returns the Certificate of Completion to the Utility, and 2.3 The Utility has either: 2.3.1 Completed its inspection of the Generating Facility to ensure that all equipment has been appropriately installed and that all electrical connections have been made in accordance with applicable codes. All inspections must be conducted by the Utility, at its own expense, within ten Business Days after receipt of the Certificate of Completion and shall take place at a time agreeable to the Parties. The Utility shall provide a written statement that the Generating Facility has passed inspection or shall notify the Customer of what steps it must take to pass inspection as soon as practicable after the inspection takes place; or 2.3.2 If the Utility does not schedule an inspection of the Generating Facility within ten Business Days after receiving the Certificate of Completion, the witness test is deemed waived (unless the Parties agree otherwise); or 2.3.3 The Utility waives the right to inspect the Generating Facility. 5 NC 20 kW Inverter 2.4 The Utility has the right to disconnect the Generating Facility in the event of improper installation or failure to return the Certificate of Completion. 2.5 Revenue quality metering equipment must be installed and tested in accordance with applicable American National Standards Institute (ANSI) standards and all applicable regulatory requirements. 3.0 Safe Operations and Maintenance The Customer shall be fully responsible to operate, maintain, and repair the Generating Facility as required to ensure that it complies at all times with the interconnection standards to which it has been certified. 4.0 Access The Utility shall have access to the disconnect switch (if a disconnect switch is required) and metering equipment of the Generating Facility at all times. The Utility shall provide reasonable notice to the Customer, when possible, prior to using its right of access. 5.0 Disconnection The Utility may temporarily disconnect the Generating Facility upon the following conditions: 5.1 For scheduled outages upon reasonable notice. 5.2 For unscheduled outages or emergency conditions. 5.3 If the Generating Facility does not operate in a manner consistent with these Terms and Conditions. 5.4 The Utility shall inform the Customer in advance of any scheduled disconnection, or as soon as is reasonable after an unscheduled disconnection. 6.0 Indemnification The Parties shall at all times indemnify, defend, and save the other Party harmless from, any and all damages, losses, claims, including claims and actions relating to injury to or death of any person or damage to property, demand, suits, recoveries, costs and expenses, court costs, attorney fees, and all other obligations by or to third parties, arising out of or resulting from the other Party's action or inactions of its obligations hereunder on 6 NC 20 kW Inverter behalf of the indemnifying Party, except in cases of gross negligence or intentional wrongdoing by the indemnified Party. 7. 0 Insurance All insurance policies must be maintained with insurers authorized to do business in North Carolina. The Parties agree to the following insurance requirements: 7.1 If the Customer is a residential customer of the Utility, the required coverage shall be a standard homeowner's insurance policy with liability coverage in the amount of at least $100,000 per occurrence. 7.2 For an Interconnection Customer that is a non-residential customer of the Utility proposing to interconnect a Generating Facility no larger than 250 kW, the required coverage shall be comprehensive general liability insurance with coverage in the amount of at least $300,000 per occurrence. 7.3 The Customer may provide this insurance via a self-insurance program if it has a self-insurance program established in accordance with commercially acceptable risk management practices. 8.0 Limitation of Liability Each Party's liability to the other Party for any loss, cost, claim, injury, or expense, including reasonable attorney's fees, relating to or arising from any act or omission hereunder, shall be limited to the amount of direct damage actually incurred. In no event shall either Party be liable to the other Party for any indirect, special, incidental, consequential, or punitive damages of any kind. 9.0 Termination The agreement to interconnect and operate in parallel may be terminated under the following conditions: 9.1 By the Customer By providing written notice to the Utility and physically and permanently disconnecting the Generating Facility. 9.2 By the Utility If the Generating Facility fails to operate for any consecutive 12-month period or the Customer fails to remedy a violation of these Terms and Conditions. 7 NC 20 kW Inverter 9.3 Permanent Disconnection In the event this Agreement is terminated, the Utility shall have the right to disconnect its facilities or direct the Customer to disconnect its Generating Facility. 9.4 Survival Rights This Agreement shall continue in effect after termination to the extent necessary to allow or require either Party to fulfill rights or obligations that arose under the Agreement. 10.0 Assignment/Transfer of Ownership of the Facility 10.1 This Agreement shall not survive the transfer of ownership of the Generating Facility to a new owner. 10.2 The new owner must complete and submit a new Interconnection Request agreeing to abide by these Terms and Conditions for interconnection and parallel operations within 20 Business Days of the transfer of ownership. The Utility shall acknowledge receipt and return a signed copy of the Interconnection Request Application Form within ten Business Days. 10.3 The Utility shall not study or inspect the Generating Facility unless the new owner's Interconnection Request Application Form indicates that a Material Modfication has occurred or is proposed. 8 NC 20 kW Inverter HARNETT COUNTY CENTRAL PERMITTING P.O. BOX 65 LILLINGTON, NC 27546 For Inspections Call : (910) 893-7525 Fax: (910) 893-2793 Application Number 18-50043518 Date 3/13/18 Property Address 94447 *UNASSIGNED PARCEL NUMBER 11-0661- - -0034- -01- Application type description CP STANDALONE TRADE - RESIDENTIAL Subdivision Name C B MATTHEW ESTATE Property Zoning RES/AGRI DIST - RA-40 Owner Contractor BRITTON TIMOTHY & CHERYL EMERALD ENERGY 492 HILLIARD RD PO BOX 99031 FUQUAY-VARINA NC 27526 RALEIGH NC 27624 (919) 247-3670 Applicant EMERALS ENERGY PO BOX 99031 RALEIGH NC 27624 (919) 247-3670 --- Structure Information 000 000 ROOF MOUNT SOLAR PANELS Flood Zone FLOOD ZONE X Other struct info PROPOSED USE SOALR PANELS WATER SUPPLY UNKNOWN Permit RESIDENTIAL ELECTRICAL PERMIT Additional desc . SOLAR PANELS Phone Access Code 1233220 Issue Date . . . 3/13/18 Valuation . . . . 0 Expiration Date . 3/13/19 Special Notes and Comments T/S : 03/09/2018 03 : 06 PM JBROCK ---- 3155 NC 210 N HARNETT COUNTY CENTRAL PERMITTING P.O. BOX 65 LILLINGTON, NC 27546 For Inspections Call : (910) 893-7525 Fax: (910) 893-2793 Page 2 Application Number 18-50043518 Date 3/13/18 Property Address 94447 *UNASSIGNED PARCEL NUMBER 11-0661- - -0034- -01- Application description . CP STANDALONE TRADE - RESIDENTIAL Subdivision Name C B MATTHEW ESTATE Property Zoning RES/AGRI DIST - RA-40 Permit RESIDENTIAL ELECTRICAL PERMIT Additional desc . SOLAR PANELS Phone Access Code 1233220 Required Inspections Phone Insp Seq Insp# Code Description Initials Date 999 211 E211 R*ELEC ABOVE CEILING / / 999 217 E217 R*ELEC RECONNECT _/_/_ 999 205 E205 R*ELEC UNDER SLAB / /_ 999 215 E215 R*ELEC. UND. POOL / /_ 999 213 E213 R*ELECTRICAL UNDERGROUND _/_/_ 999 131 R131 ONE TRADE FINAL /_/_ 999 125 R125 ONE TRADE ROUGH IN / /_ HARNETT COUNTY CASE TS CUSTOMER RECEIPTC*** *** Date: I 3R13/18 52 RCK eceiptpe: PDrawer: no: 286697 Year Humber Amount 2818 58043518 94447 *UNASSIGNED LILLINGTON, NC 27546 I DI BP - PERMIT FEES 308.88 SOLAR PERMIT JOHN LEONARD Tender detail 0B.88 CP CREDIT CARD g 3 Total tendered SUM Total payment Trans date: 3/13/18 Time: 18:38:25 ** THANK YOU FOR YOUR PAYMENT **