PLAN REVIEW SHEET SiDate is
Plan Box# C5 Job Nae IM.ld/4 1 (90/1 Edna
`-L
Plan Name-11(b? (We ncreE
App# U3(4L q Valuation 38%1bo SQ Feet Yogi-
,
Garage /r.
= Imo
Inspections for SFD/SFA \ //
Crawl Slab Mono Basement v
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor ' Slab Mono Slab Plum Under slab
Rough In Rough In ' Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
p Final
Foundation Survey Envir. Health(? a / Other
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final