PLAN REVIEW SHEET Date 7, 2 2_6 -1S
Plan Box# ��A� Job NameI �l � Y � yy 1 I(W( �S
Plan Name �� I E $ (1) LE) i
App # 43i ) Valuation a'IP117th SQ Feet ;%.
Garage Me
= ,3598
Inspections for SFD/SFA
Crawl_ Slab V Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab
Plum Under slab
Rough In
g Rough In Rough In Address
Insulation Insulation Insulation
Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey_ Envir. Health(1P RI Other
Additions/Other
•
Footing_
Foundation_
Slab_
Mono_
Open Floor
Rough In
Insulation_
Final