PLAN REVIEW SHEET Date t(2\ II q
Plan Box N Q1 Job Name ft pi tws �t/10. � 4. tik
Plan Name 1(1\C"u✓J g
App# I$'� '1 UI Valuation 31o194Y SQ Feet ?aJQ
Garage YroY
= 3.703
Inspections for SFD/SFA /
Crawl_ Slab V Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation EIe. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
o� ( Final
Foundation SurveyUJ Envir. Health , \ PQ/( Other
Additions/ Other
Footing_
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final