Loading...
PLAN REVIEW SHEET f� Date 11 Plan Box# ` 1 Job Name Plan Name i tWL' App # t1 sbDtx2)5s Valuation ?3 S 34,- SQ Feet a4/S'3 Garage t/2-s = marl Inspections for SFD/SFA Crawl V Slab Mono_ Basement_ Footing Footing Plum Under Slab Footing Foundation Foundation Ele. Under Slab Foundation Address Address Address Waterproofing Open Floor Slab Mono Slab Plum Under slab Rough In Rough In Rough In Address Insulation Insulation Insulation Slab Final Final Final Open Floor Rough In Insulation No Final Foundation Survey_ Envir. Health No Other Additions / Other Footing Foundation_ Slab_ Mono_ Open Floor_ Rough In Insulation_ Final •