Loading...
PERMIT / REVIEW HARNETT COUNTY CENTRAL PERMITTING P.O. BOX 65 LILLINGTON, NC 27546 For Inspections Call: (910) 893-7525 Fax: (910) 893-2793 Application Number 18-50043061 Date 2/07/18 Property Address 4466 SPRING HILL CHURCH RD PARCEL NUMBER 13-0519- - -0042- -02- Application type description CP NEW RESIDENTIAL (SFD) Subdivision Name Property Zoning RES/AGRI DIST - RA-30 Owner Contractor HASKINS STEVEN E CO TRUSTEE & SIGNATURE HOME BUILDERS HASKINS PEGGY J CO TRUSTEE 1209 N MAIN ST 1130 NEWPOERT WAY LILLINGTON NC 27546 ROSEVILLE CA 95661 (910) 892-9299 Applicant SHERROD CHRIS --- Structure Information 000 000 77X53 4BD 2 . 5BA STEM WALL W/GARAGE Flood Zone FLOOD ZONE X Other struct info # BATHS 2 . 5 # BEDROOMS 4 . 00 PROPOSED USE SFD SEPTIC - EXISTING? NEW TANK WATER SUPPLY COUNTY Permit BLDG,MECH, ELEC, PLB, INSU PERMIT Additional desc . Phone Access Code 1227644 Issue Date . . . 2/07/18 Valuation . . . . 0 Expiration Date . 2/07/19 Special Notes and Comments T/S : 01/09/2018 03 : 22 PM BPETRICH -- TAKE OLD US 421 TOWARD MAMERS FROM LILLINGTON - LEFT ONTO SPRING HILL CHURCH RD - HOUSE WILL BE ON LEFT APROX 1 . 5 MILES. 4466 SPRING HILL CHURCH RD LILLINGTON HARNETT COUNTY CENTRAL PERMITTING P.O. BOX 65 LILLINGTON, NC 27546 For Inspections Call: (910) 893-7525 Fax: (910) 893-2793 Page 2 Application Number 18-50043061 Date 2/07/18 Property Address 4466 SPRING HILL CHURCH RD PARCEL NUMBER . 13-0519- - -0042- -02- Application description . . CP NEW RESIDENTIAL (SFD) Subdivision Name Property Zoning RES/AGRI DIST - RA-30 Permit BLDG,MECH, ELEC, PLB, INSU PERMIT Additional desc . Phone Access Code 1227644 Required Inspections Phone Insp Seq Insp# Code Description Initials Date 10-30 814 A814 ADDRESS CONFIRMATION 10 101 8101 R*BLDG FOOTING / TEMP SVC POLE 20 103 B103 R*BLDG FOUND & TEMP SVC POLE / /-- 30-999 111 B111 R*BLDG SLAB INSP/TEMP SVC POLE / /-- 30-999 309 P309 R*PLUMB UNDER SLAB / / 40-50 129 I129 R*INSULATION INSPECTION 40-60 425 R425 FOUR TRADE ROUGH IN /--/-- 40-60 125 R125 ONE TRADE ROUGH IN /--/-- 40-60 325 R325 THREE TRADE ROUGH IN / / 40-60 225 R225 TWO TRADE ROUGH IN / / 50-60 429 R429 FOUR TRADE FINAL / / 50-60 131 R131 ONE TRADE FINAL _/ /_ 50-60 329 R329 THREE TRADE FINAL / / 50-60 229 R229 TWO TRADE FINAL / / 50-60 209 E209 R*ELEC TEMP POWER CERT 999 H824 ENVIR. OPERATIONS PERMIT / / Date_° Plan Box#� Job Name Sy rl&from. ltwvJ I /� Plan NameMflf Qflt i t[i 0 12g sl dun CX- App f! l 6 Sv°� JUS I Valuation It�� I�DIf 11 SQ Feet o Garage V 77 = SS_ Inspections for SFD/SFA1,UU-�'I Crawl Slab Mono Basement Footing Footing Plum Under Slab Footing Foundation Foundation Ele.Under Slab Foundation Address Address Address Waterproofing Open Floor ' Slab Mono Slab Plum Under slab Rough In Rough In - Rough In Address Insulation Insulation Insulation Slab Final Final Final Open Floor Rough In Insulation nJf (� r bilk-) Final Foundation Survey 1146 Envir. Health I`� �w\ Other • Additions/Other Footing Foundation_ Slab_ Mono_ Open Floor_ Rough In Insulation_ Final