PERMIT / REVIEW HARNETT COUNTY CENTRAL PERMITTING
P.O. BOX 65
LILLINGTON, NC 27546
For Inspections Call: (910) 893-7525 Fax: (910) 893-2793
Application Number 18-50043061 Date 2/07/18
Property Address 4466 SPRING HILL CHURCH RD
PARCEL NUMBER 13-0519- - -0042- -02-
Application type description CP NEW RESIDENTIAL (SFD)
Subdivision Name
Property Zoning RES/AGRI DIST - RA-30
Owner Contractor
HASKINS STEVEN E CO TRUSTEE & SIGNATURE HOME BUILDERS
HASKINS PEGGY J CO TRUSTEE 1209 N MAIN ST
1130 NEWPOERT WAY LILLINGTON NC 27546
ROSEVILLE CA 95661 (910) 892-9299
Applicant
SHERROD CHRIS
--- Structure Information 000 000 77X53 4BD 2 . 5BA STEM WALL W/GARAGE
Flood Zone FLOOD ZONE X
Other struct info # BATHS 2 . 5
# BEDROOMS 4 . 00
PROPOSED USE SFD
SEPTIC - EXISTING? NEW TANK
WATER SUPPLY COUNTY
Permit BLDG,MECH, ELEC, PLB, INSU PERMIT
Additional desc .
Phone Access Code 1227644
Issue Date . . . 2/07/18 Valuation . . . . 0
Expiration Date . 2/07/19
Special Notes and Comments
T/S : 01/09/2018 03 : 22 PM BPETRICH --
TAKE OLD US 421 TOWARD MAMERS FROM
LILLINGTON - LEFT ONTO SPRING HILL
CHURCH RD - HOUSE WILL BE ON LEFT APROX
1 . 5 MILES.
4466 SPRING HILL CHURCH RD LILLINGTON
HARNETT COUNTY CENTRAL PERMITTING
P.O. BOX 65
LILLINGTON, NC 27546
For Inspections Call: (910) 893-7525 Fax: (910) 893-2793
Page 2
Application Number 18-50043061 Date 2/07/18
Property Address 4466 SPRING HILL CHURCH RD
PARCEL NUMBER . 13-0519- - -0042- -02-
Application description . . CP NEW RESIDENTIAL (SFD)
Subdivision Name
Property Zoning RES/AGRI DIST - RA-30
Permit BLDG,MECH, ELEC, PLB, INSU PERMIT
Additional desc .
Phone Access Code 1227644
Required Inspections
Phone Insp
Seq Insp# Code Description Initials Date
10-30 814 A814 ADDRESS CONFIRMATION
10 101 8101 R*BLDG FOOTING / TEMP SVC POLE
20 103 B103 R*BLDG FOUND & TEMP SVC POLE / /--
30-999 111 B111 R*BLDG SLAB INSP/TEMP SVC POLE / /--
30-999 309 P309 R*PLUMB UNDER SLAB / /
40-50 129 I129 R*INSULATION INSPECTION
40-60 425 R425 FOUR TRADE ROUGH IN /--/--
40-60 125 R125 ONE TRADE ROUGH IN /--/--
40-60 325 R325 THREE TRADE ROUGH IN / /
40-60 225 R225 TWO TRADE ROUGH IN / /
50-60 429 R429 FOUR TRADE FINAL / /
50-60 131 R131 ONE TRADE FINAL _/ /_
50-60 329 R329 THREE TRADE FINAL / /
50-60 229 R229 TWO TRADE FINAL / /
50-60 209 E209 R*ELEC TEMP POWER CERT
999 H824 ENVIR. OPERATIONS PERMIT / /
Date_°
Plan Box#� Job Name Sy rl&from. ltwvJ
I /� Plan NameMflf Qflt i t[i 0 12g sl dun CX-
App f! l 6 Sv°� JUS I Valuation It�� I�DIf 11 SQ Feet o
Garage V 77
= SS_
Inspections for SFD/SFA1,UU-�'I
Crawl Slab Mono Basement
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele.Under Slab Foundation
Address Address Address Waterproofing
Open Floor ' Slab Mono Slab Plum Under slab
Rough In Rough In - Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
nJf (� r bilk-)
Final
Foundation Survey 1146 Envir. Health I`� �w\ Other
•
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final