PLAN REVIEW SHEET rbc- Date LS/ 18
Plan Box # CS Job Name ti rf.c.i sr on
Plan Name
App # L4kCt C1 liJ Valuation 4r"l /X i SQ Feet r21
Garage '422
=
Inspections for SFD/SFA
Crawl_ Slab ✓ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey / Envir. Health Other
Additions/ Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_