PLAN REVIEW SHEET Date 1'-1/01l
Plan Box # OS Job Name ONOn/ Q .t1 1Z94Cn
�[ Plan Name
App # tAaGltov Valuation 33if)V o SQ Feet 3'3-0/
Garage $'O
= gaol
Inspections for SFD/SFA
NY
Crawl_ Slab_ Mono Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
/ Final
Foundation Survey" Envir. Health_ Other
Additions / Other
Footing_
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_