PLAN REVIEW SHEET Date 13 l { I
Plan Box # E lQ Job Name 4,11Th
Plan Name
App # 5 ) Valuation/1310 tilt SQ Feet .30.13q
Garage 5??
= 47SZo
Inspections for SFD/SFA
Crawl ✓ Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey_ Envir. Health ✓_/// Other
Additions/ Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_