PLAN REVIEW SHEET Date )' a.7
Plan Box a g3 Job Name VY,{C-Ciln . .Ll1 C
Plan Name
App # Y? I 2- Valuation4M (ad SQFeet ;003°
Garage
= 5a3
Inspections forSFD/SFA /
Crawl_ Slab_J Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation EIe. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In _ Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey�' Envir. HealthCLO Other
Additions/ Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final