Loading...
FMFW SPRINKLER PLAN REVIEW Harnett )(Th COUNTY * AFM, t.r,ewyy Samosa»rwrlownettin NUM GiLJN♦ rr "' �V Plan Review, Inspection, and Permit Fees Application Number 1750041183 $200.00 ❑ Explosive Material (90 Days) $ - $100.00 ❑ Explosive Materials (72 Hours) $ - $100.00 ❑ Fireworks Public Display $ - $50.00 ❑ Final Inspection $ - $35.00 +$2.00per device ❑ Fire Alarm Testing $ - $35.00 +$2.00 per nozzle ❑ Fixed Fire Suppression $ - $75.00 ❑ Insecticide Fog/Fumigation $ $100.00 ❑ Pipe Test/UST/AGST $ - $50.00 ❑ Plans up to 5000 sq ft $ - $100.00 ❑ Plans 5001 sq ft to 10,000 sq ft $ - $150.00 ❑ Plans 10,001 sq ft to 25,000 sq ft $ - $250.00 ❑ Plans 25,001 sq ft and over $ - $35.00 +2.00per head 2 Sprinkler Certification Test $ 35.00 $50.00 ❑ Standpipe Testing $ - $50.00 ❑ Special Assembly Pe.amusement buildings,carnivals,fairs) $ - $75.00 • Tents/Canopies/Air Supported Structure $ - $100.00 • Tank Installation (charge for each tank) $ - $100.00 ❑ Tank Removal (charge for each tank) $ - 147 Total Devices/Heads $ 294.00 Total Cost $ 329.00 Code Enforcement Official Rodney Daniels 12/18/2017 Snaps r N COHarnett ��'"� UTY it ® ^' E•iryderrSnaps Dq.rt.nt %Mt- tnac.[x, �FM> ntAA root,ry Fire Marshal Division December 18, 2017 Associated Fire Protection 5121 Wedespan Drive Clayton, NC 27520 Re: Campbell University Admissions Building 40 T.T. Lanier Street Butes Creek, NC 27506 Application Number 17-50041183 To Whom It May Concern, Thank you for submitting the sprinkler system plans for Campbell University Admissions Building. The plans have been carefully reviewed by a qualified code enforcement official to examine for compliance with the North Carolina Fire Prevention Code and all other fire protection regulatory documents. There are some items that were found during the plan review process that need to be addressed before a final inspection of the new facility can be given. These items are outlined and described below. • Notes o Installation of the sprinkler system shall be per contract specifications • 901.5 Installation acceptance testing. o All piping and attached appurtenances subjected to system working pressure shall be hydrostatically tested at 200 psi or 50 psi in excess of the system working pressure, whichever is greater, and shall maintain that pressure without loss for 2 hours. This test is required to be witnessed by a representative from the Harnett County Fire Marshal's Office. o A contractor's material and test certificate shall be furnished by the trained representative of Associate Fire Protection, Inc. before final approval. o A piping and hanger inspection is required before closure of ceiling ®Harnett couf+ rr A �GVI :nAP,.:NA (FIt'� E�rE�rUMW./D�mre �v. wrtlwrnwt.ry system(s). o A sprinkler final inspection is required at completion of project. o Schedule all Inspections with the Fire Marshal's Office. o 910-893-0743 Thank you again for submitting the sprinkler plans. Please review the plans and adhere to any notes and alterations that were made in addition to the original drawings. These remarks are for the plans that were submitted and its original intent. These remarks do not apply if the original intent changes or what was submitted on the above date changes. If you have any questions, please do not hesitate to call this office. Sincerely, Rpt g Rodney Danie s Chief Deputy Fire Marshal