PLAN REVIEW SHEET -- 1
Date i ) S L S I ‘-)
Plan Box# -1----":'5 Job Name 1+
Plan Name J c- a (p L f-I
App # 4a--) 1.07) Valuation//SA SQ Feet !kms
Garage ` ll
I4-?
Inspections for SFD/SFA
Crawl_____ Slab_____
_
Mono Basement
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address
Waterproofing
Open Floor Slab Mono Slab
Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation
Slab
Final Final Final
Open Floor
Rough In
Insulation
Final
7 Foundation SurveyEnvir. Health______ Other
Additions/ Other
Footing_
Foundation
Slab
Mono______
Open Floor_____
Rough In__,__
Insulation
Final_____