PLAN REVIEW SHEET Date 1. 1/9/ ) —7
Plan Box # AD-- Job Name AO At/Amery) letilo Varf071S
Plan Name
App# t/ta1 S • 1 73 l Valuationl.sf1 lolly SQ /,�
� Feet, Y'�-
4 ag /o73
Coil Car ''P =
Inspections for SFD/SFA
Crawl Slab Mono Basement
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation SurveyNcD Envir. Health ( (c
Other
Additions/ Other I U c(I l < IiiGvirickFE ;:tion1
tiiG�Z
� C� ���l
Mono ,j "r - v
Open Floor
Rough In
Insulation
Final