PLAN REVIEW SHEET Date ll/I3VI7
Plan Box# C ` Job Name /JC ('U 3+0 vin !1
Plan Name LCV 6 _ $ i a
ee6iatiA-CL
App # )-a Valuation 15-5 O SQ Feet Liao
Garage 7Q0
= ( O
Inspections for SFD/SFA
Crawl (\..7 Slab
Mono Basement
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey N " " Envir. Health AR)-A) Oth
er
Additions/ Other
Footing
Foundation
Slab
Mono
Open Floor
Rough In
Insulation
Final