PLAN REVIEW SHEET Date CA/ `'1 I
Plan Box # 8(.4 Job Name ThFrr (ntW Cant -t1
int
App # LO-3-(19- Valuation K%1?1 SQ Feet
Garage /4
= .n
Inspections for SFD/SFA
Crawl_ Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab • Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey Envir. Health _1\1- Other
Additions / Other 6 JX51; Atcli-h°1
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In__
Insulation_
Final_