Loading...
PLAN REVIEW SHEET Date CA/ `'1 I Plan Box # 8(.4 Job Name ThFrr (ntW Cant -t1 int App # LO-3-(19- Valuation K%1?1 SQ Feet Garage /4 = .n Inspections for SFD/SFA Crawl_ Slab_ Mono_ Basement_ Footing Footing Plum Under Slab Footing Foundation Foundation Ele. Under Slab Foundation Address Address Address Waterproofing Open Floor Slab Mono Slab • Plum Under slab Rough In Rough In Rough In Address Insulation Insulation Insulation Slab Final Final Final Open Floor Rough In Insulation Final Foundation Survey Envir. Health _1\1- Other Additions / Other 6 JX51; Atcli-h°1 Footing Foundation_ Slab_ Mono_ Open Floor_ Rough In__ Insulation_ Final_