Loading...
INSPECTION W/ ENG LETTER PREPARED 10/18/17, 14:17:37 INSPECTION TICKET PAGE 41 Harnet t County INSPECTOR: IVR DATE 10/19/17 ADDRESS . : 441 FALLS CREEK DR SUBDIV: ACC CROSSING PH8 SECT2A 21LTS CONTRACTOR : WYNN CONSTRUCTION, INC. PHONE : (919) 528-1347 OWNER . . : ANDERSON CREEK PARTNERS LP PHONE : PARCEL . . : 01-0535-26- -0100- -02- APPL NUMBER: 17-50042165 CP NEW RESIDENTIAL (SFD) DIRECTIONS : T/S: 08/29/2017 03 :44 PM JBROCK ---- ANDERSON CREEK CROSSING #91 STRUCTURE: 000 000 46.1X45.9 4BOR MONO W/ GARAGE & COV PORC FLOOD ZONE • FLOOD ZONE X # BEDROOMS • 4000000.00 PROPOSED USE • SFD SEPTIC - EXISTING' • SEWER WATER SUPPLY - COUNTY PERMIT: CPSF 00 CP • SFD REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS A814 01 10/06/17 SB ADDRESS CONFIRMATION TIME: 17:00 VRU #: 003034576 10/05/17 AP 441 FALLS CREEK DR SPRING LAKE 28390 T/S: 10/05/2017 08:29 AM SBENNETT E207 01 10/06/17 JH R*ELEC TEMP SERVICE POLE TIME: 17 :00 VRU #: 003034592 10/06/17 DA T/S: 10/04/2017 02:33 PM LLUCAS Panel loose on pole P309 01 10/06/17 JH R•PLUMB UNDER SLAB TIME: 17:00 VRU #: 003034584 10/06/17 AP T/S: 10/04/2017 02 :16 PM JBROCK B114 01 �1�0�/1�9 17 TI q/666'4/ R'BLDG MONO SLAB/TEMP SVC POLE TIME: 17:00 VRU #: 003040771 T/S: 10/17/2017 03:20 PM BPETRICH E207 02 10/19//17TIIIA A . R'ELEC TEMP SERVICE POLE TIME: 17:00 VRU #: 003040789 /0-1 9-"q ^•/ !Y'f!/ T/S: 10/17/2017 03:21 PM BPETRICH COMMENTS AND NOTES 4 7 / t C- DAVID MILLER, PE 6300 Creedmoor Rd, STE 1704363 Raleigh, NC 27612 (919)422-8932(Office); DAVE@DMA-PA.COM October 18,2017 WYNN CONSTRUCTION 2550 CAPITAL DRIVE SUITE 105 CREEDMOOR,NC 27522 E-mailed to:jason@wynnhomes.com ; keithawynnconstruct.com ; cislunhana.@wynnhomes.com Craig Dunham 910-988-5691 RE: Engineering- Foundation Lot 91 Anderson Creek Crossing Lillington,NC Project No.:17DDM-1018D To whom it may concern/Inspections Dept.: The undersigned arrived on-site 10-18-17 to observe and test the in-place fill conditions for the above referenced site. Based on the testing(Per ATM Special publication 399)the bearing materials (Tan silty to sandy clay to clayey sand(Unified Soil Classification System- CL/SC)) were adequate to support the planned structure Based on the observations and testing the bearing soils for the footings will provide adequate support. Sincerely, David Miller, PE DEM/17DDM-1018D ‘‘‘‘k ttwinnow/2j DacuSianie N` .0/18/2017 %Afie& '4• C31 °'1 'Ili/Sill ••••%)