Loading...
FM PLAN REVIEW - FIRE SPRINKLER ADD Harnett COUNTY �FM> tranen.,Somas De .,a,.nr .wua..n.rcwp Plan Review, Inspection, and Permit Fees Application Number 17-50041784 $100.00 ❑ DRB Major Sub Division Prelim Site Plans $ - $200.00 ❑ Explosive Material (90 Days) $ - $300.00 ❑ Explosive Materials (72 Hours) $ - $100.00 ❑ Fireworks Public Display $ - $50.00 0 Final Inspection $ - $35.00 +$2.00 per device ❑ Fire Alarm Testing $ - $35.00 +$2.00 per nozzle 0 Fixed Fire Suppression $ - $75.00 U Insecticide Fog/Fumigation $ - $100.00 ❑ Pipe Test/UST/AGST $ - $50.00 0 Plans up to 5000 sq ft $ - $100.00 ❑ Plans 5001 sq ft to 10,000 sq ft $ - $150.00 0 Plans 10,001 sq ft to 25,000 sq ft $ - $250.00 ❑ Plans 25,001 sq ft and over $ - $35.00 +2.00 per head o Sprinkler Certification Test $ 35.00 $50.00 U Standpipe Testing $ - ❑ Special Assembly $50.00 (ie.amusement buildings,carnivals,fairs) $ - $75.00 ❑ Tents/Canopies/Air Supported Structure $ - $100.00 ❑ Tank Installation (charge for each tank) $ - $100.00 0 Tank Removal (charge for each tank) $ - Total Devices/Heads $ - Total Cost $ 35.00 Code Enforcement Official Bill Lamm 10/23/2017 ' -Harnett ^M.1 E—,...,.wu.ow October 23,2017 Fire Technologies Inc James Mills 910-282-8565 PO Box 134 Castle Haynes NC 28425 Re; Aptitudes Habilitation Sprinkler Up fit 185 Mittie Haddock Dr. Cameron NC 28326 Application Number 17-50041784 Mr. Mills Thank you for submitting the plans for the sprinkler system Up fit. The plans have been carefully reviewed by a qualified code enforcement official to examine for compliance with the North Carolina Fire Prevention Code and all other fire protection regulatory documents. There are some items that were found during the plan review process that need to be addressed before a final inspection of the facility can be given. These items are outlined and described below. • 901.2.1 State of Compliance. o Before requesting final approval of the installation, where required by the fire code official, the installing contactor shall furnish a written statement to the fire code official that the subject fire protection system has been installed in accordance with the manufacture's specifications and the appropriate installation standard. Any deviations from the design standards shall be noted and copies of the approvals for such deviations shall be attached to the written statement. o All work shall be performed in accordance with NFPA 13 and the NCSFC. • 901.5 Installation acceptance testing. o All piping and attached appurtenances subjected to system working pressure shall be hydrostatically tested at 200 psi or 50 psi in excess of the system working pressure, whichever is greater, and shall maintain that pressure without loss for 2 hours. This test is required to be witnessed by a representative from the Harnett County Fire Marshal's Office. o A contractor's material and test certificate shall be furnished by the trained representative of Fire Technologies before final approval. Harnett 4.. s•.�..r s• ar••••K tie *& th9 1R1" [Ak 0_:NA • Notes o A sprinkler system construction permit is required. o Please schedule all inspections through the Fire Marshal's Office. o 910-893-0741 Thank you again for submitting the plans for the sprinkler system Up Fit. Please review the plans and adhere to any notes and alterations that were made in addition to the original drawings. If you have any questions, please do not hesitate to call this office. Again,thank you and we look forward to working with you during the construction period! Sincerely, Bill Lamm Fire Marshal